Cathode Installation, Dracut, MA

ABC Soils, Inc. installed 6" diameter holes, 12 feet deep and trenches at a natural gas sub-station for the installation of a series of anodes to aid in the maintenance of the piping and equipment. We provided the vacuum excavation equipment, dump truck with built-in air compressor, air spade, one laborer and machine operator for the job. The client provided one laborer to assist us in the work. The installation of some of the vertical holes was hampered by the presence of large rocks about eight feet deep and trenches were installed at those locations. The project was completed in two days.